Take a little extra care when travelling through Deepwater this week and next, with roadworks underway.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Transport for NSW is advising motorists of changed traffic conditions on the New England Highway at Deepwater for road surface repairs to be carried out between Cadell and Alice streets.
Work starts on Monday, July 13 and will be carried out from 7am to 6pm on weekdays and from 7am to 2pm on Saturdays.
It's expected to take two weeks to complete, weather permitting.
Some lane closures will be in place with traffic control and a reduced speed limit for the safety of workers and motorists.
Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.
Transport for NSW is thanking motorists in advance for their patience during this time.
Traffic updates can be found on the Live Traffic NSW App, online at livetraffic.com or by calling 132 701.